A-18.1, r. 7 - Regulation respecting standards of forest management for forests in the domain of the State

Full text
82. When constructing or improving a road, constructing a power line, laying out a piling, lopping or sawing area, setting up a forest camp or opening or enlarging a sand pit, a holder of a management permit shall harvest the trees having a diameter equal to or greater than the diameter specified in the forest management permit or in an authorization, as the case may be.
O.C. 498-96, s. 82.